Basement Finishing Permit

Apply for a Single Family Dwelling Basement Finishing Permit for detached homes and single family dwelling homes.

Below is a checklist of all the steps and documents you'll need to complete the application for a Basement Finishing Permit. Upload documents or mark items complete as you go. Once done, create your application package to download or email it directly to authorities.

Permit Requirements Checklist
0%
Name
Additional Information
Action Needed
Completed
Name: Building Permit Application Form Permit
Additional Information: Complete this form - Building Permit Application Form.
Upload it here when completed.
Action Needed: Upload
Name: A current Title Search of the property Permit
Additional Information: May be obtained from the Land Title and Survey Authority of BC. Records such as land titles and plans can be accessed through myLTSA at www.ltsa.ca
Upload it here when completed.
Action Needed: Upload
Name: An Owner Authorization Form Permit
Additional Information: An Owner Authorization Form (if the Applicant is not the Owner)
Action Needed: Upload
Name: One complete set of drawings including Permit
Additional Information: A site plan accurately drawn to scale showing:
  • The entire lot, legal description of the property, property lines and identification and dimensions of setbacks of the main dwelling from the property line.
A floor plan at a scale of ¼" = 1'0" or metric equivalent accurately drawn to scale that shows:
  • The proposed basement layout;
  • State the square footage of the entire basement floor and, if the entire basement is not being finished, also state the square footage of the area that is proposed to be finished;
  • Dimension the overall width and length of the basement, outside of foundation wall to outside of foundation wall, as well as the width and length of each room, and width of each hallway;
  • Label the use of each proposed and existing room;
  • Provide the width and height of each door and each window. The BC Building Code requires minimum egress dimensions for bedroom windows and bedroom window wells, as well as minimum entrance door sizes. See BCBC;
  • Provide construction details of all proposed wall assemblies;
  • Show all plumbing fixtures. Identify proposed and existing fixtures; and
  • Show the location of any bathroom exhaust fan that may be required.
All plans and information submitted must be legible and suitable quality for scanning. Minimum size 11" x 17" sheets are required (24" x 36" preferred). Blueprint paper, vellum or graph paper will not be accepted. Drawings in colour ink or in pencil will not be accepted. Drawings should not be laminated. Reversed plans are not acceptable.
Action Needed: Upload
Name: Permit Fee Permit
Additional Information: Refer to this Fee schedule - Permit Fee
Action Needed: Mark the checkbox
Name: Damage Deposit Permit
Additional Information:
Action Needed: Pay the fees and mark the checkbox.
Name: A Registered Professional (RP) may be required Permit
Additional Information: May be required to provide signed and sealed drawings if any of the basement finishing involves changes to the structural elements of the building.
Action Needed: Mark the checkbox
Disclaimer: Please note that Cognitive is a permit management platform designed to help you organize and track your permit application and management process. We do not issue permits or guarantee permit approvals. All final permit decisions are made by the relevant city authorities. Please consult the city’s official resources for the most up-to-date and accurate information regarding the documents, other requirements and your application. If you have any specific questions or concerns about your permit, we recommend contacting the city directly.