Case Study: Small Construction Company Building a Deck in Surrey, BC
Client Overview
Company Name: XYZ Builders Location: Surrey, BC Project: Building a deck for a residential home
The Challenge
XYZ Builders, a small construction company, was contracted to build a custom deck for a homeowner in Surrey, BC. Like most small businesses, their resources were limited, and navigating the local permitting process was often a time-consuming task. Obtaining a deck permit required identifying the correct documents, filling out forms, and ensuring compliance with city regulations—all while managing tight project deadlines.
The Solution
XYZ Builders turned to Cognitive, our AI-powered permit management platform, to simplify the process. Using the Deck Permit Documents Checklist available on our website, the company was able to:
- Access a pre-prepared checklist of all documents required for the permit.
- Upload the necessary documents directly to the platform and mark them as completed.
- Generate a fully prepared application package that was ready for submission to the city.
The Results
By using Cognitive, XYZ Builders:
- Saved 8 hours of administrative time.
- Submitted their permit application 2 days earlier than anticipated.
- Avoided re-submissions thanks to error-free documentation.
Disclaimer:
This scenario is an illustrative example based on typical customer challenges in the permitting process. As we continue to grow, we look forward to sharing real-world customer success stories.